0

Iowa Bitcoin Mining Hosting Facility 2

Iowa Facility 2 – Proven Operations, Upgraded for Hybrid Hosting

Expanding Institutional Access to Bitcoin Mining

MiningStore’s second Iowa facility was developed to meet rising investor demand for institutional-grade Bitcoin mining hosting. Operations began with air miners in July 2022, demonstrating stability and performance from day one. In August 2025, the site expanded to host hydro-cooled miners, cementing its role as a hybrid facility capable of supporting both technologies.

With 5 MW of power, over 1,200 slots, and connectivity to the MISO grid, Facility 2 combines operational history with cutting-edge infrastructure, offering investors the reassurance of proven results and the upside of future-ready efficiency.

MiningStore Bitcoin Mining - Facility 2

Iowa Bitcoin Mining Hosting Facility 2

Facility Highlights

    • Operations: Air mining since July 2022; Hydro mining since August 2025
    • Capacity: 5 MW total
    • Miner Slots: 1,200+ ASIC-ready positions
    • Grid Power: Connected to the MISO market, leveraging renewable-rich, competitive pricing
    • Cooling Options: Supports both air-cooled and hydro-cooled miners
    • Status: Fully deployed and at capacity
MiningStore Bitcoin Mining Facility 2 - 1

Inside Facility 2

Facility 2 was designed as a flexible hosting environment that has evolved to match the latest hardware and investor expectations.

  • Proven reliability: More than three years of continuous air-mining operations.
  • Hydro-ready upgrades: Integrated in 2025, enabling the deployment of high-density hydro ASICs for maximum efficiency.
  • Hybrid layouts: Optimized airflow for air miners; advanced liquid-cooling for hydro units.
  • Institutional oversight: On-site technicians M-F during business hours, monitoring, and preventive maintenance to maintain uptime.
  • Security and resilience: Redundant systems, access-controlled halls, and comprehensive surveillance.
  • Transparency: Investors receive real-time reporting that mirrors on-site metrics.
Bitcoin Mining - Hydro Facility MiningStore

Why Facility 2 Matters

Operational Track Record

Unlike speculative or new builds, Facility 2 has been proven since 2022 with continuous air-mining operations. This track record provides institutional investors with confidence that the infrastructure delivers consistent results.

Hybrid Capability

The 2025 hydro expansion ensures the facility can host the most advanced ASICs on the market. Investors can choose between air miners for lower upfront costs or hydro miners for peak efficiency and density, all within one site.

MISO Market Advantage

By operating in the MISO grid, Facility 2 benefits from one of the U.S.’s most dynamic energy markets. With abundant wind and solar, pricing windows often create significant cost advantages, supporting long-term ROI.

Looking Ahead

Though Facility 2 is fully allocated, its hybrid model showcases what institutional investors can expect from MiningStore: reliable operations with the flexibility to adopt next-generation mining technologies.

Conclusion: From Air to Hydro, Proven Infrastructure for Investors

Bitcoin mining is no longer defined by speculation, it has matured into an essential layer of digital asset infrastructure. MiningStore’s Iowa facility demonstrates what that looks like: proven uptime, secure operations, and scalability tailored for institutional portfolios.

Whether your allocation is $65K or multi-megawatt scale, our team provides the infrastructure, expertise, and reporting you need to execute a long-term Bitcoin strategy with confidence.

Schedule a strategy call today to review ROI models, energy strategies, and tailored entry options.

Spread The Word
MiningStore Recent Articles