0

Iowa Bitcoin Mining Hosting Facility 3

Iowa Facility 3 – Focused Air-Cooled Bitcoin Mining Infrastructure

Delivering Efficiency and Consistency Since 2023

MiningStore’s third Iowa facility was brought online in March 2023 to expand our hosting capacity within the SPP power market. Designed as a dedicated air-cooled site, Facility 3 provides a balance of proven reliability, cost efficiency, and secure operations.

With 5 MW of power capacity and over 1,300 miner slots, the site reflects our commitment to building infrastructure that serves institutional investors seeking transparent, resilient, and performance-driven Bitcoin mining exposure.

MiningStore Bitcoin Mining Facility 3 - 1

Iowa Bitcoin Mining Hosting Facility 3

Facility Highlights

  • Operations: Began March 2023
  • Capacity: 5 MW
  • Miner Slots: 1,300+ ASIC-ready positions
  • Grid Power: Connected to the SPP market for competitive energy economics
  • Cooling System: Dedicated air-cooled infrastructure optimized for uptime
  • Status: Fully deployed and at capacity
MiningStore Bitcoin Mining Facility 3 - 5

Inside Facility 3

Facility 3 was developed to complement our portfolio with a streamlined, air-focused design. It is purpose-built for investors who value simplicity, reliability, and predictable operating environments.

  • Optimized airflow systems maintain miner performance across seasons.
  • Secure and resilient infrastructure ensures continuous operations with redundant power systems.
  • Experienced on-site technicians provide proactive maintenance and monitoring to maximize uptime.
  • Transparent client dashboards give investors real-time access to performance metrics, ensuring clarity at every stage.
MiningStore Bitcoin Mining Facility 3 - 4

Why Facility 3 Matters

Expansion of SPP Market Capacity

By adding a third facility in Iowa, MiningStore deepened its presence in the SPP grid, ensuring clients benefit from competitive energy pricing and opportunities for arbitrage.

Air-Cooled Specialization

Facility 3 demonstrates the ongoing role of air-cooled infrastructure in Bitcoin mining. For investors seeking straightforward deployments without the added complexity of hydro, the site offers dependable, institutionally managed hosting.

Strong Demand Validation

All 1,300+ slots were quickly allocated, underscoring continued institutional appetite for secure, U.S.-based mining infrastructure.

MiningStore Bitcoin Mining Facility 3 - 3

Looking Ahead

Though Facility 3 is fully allocated, it highlights the ongoing demand for air-cooled hosting infrastructure. Many investors still prefer the balance of lower CapEx and reliable performance, making air a strategic complement to hydro expansion.

MiningStore continues to expand capacity, building on the lessons of Facility 3 to ensure efficient, ESG-conscious infrastructure for the next wave of institutional allocations.

Conclusion: Reliable Air-Cooled Hosting Since 2023

MiningStore’s Iowa Facility 3 demonstrates the strength of focused, air-cooled Bitcoin mining infrastructure. With 5 MW capacity, 1,300+ miner slots, and integration with the SPP market, it has delivered reliable, secure operations since March 2023.

While fully allocated, Facility 3 illustrates how institutional Bitcoin mining has matured into transparent, investment-ready infrastructure.

Schedule a confidential call with our advisors to explore availability at other MiningStore sites and develop a tailored entry strategy for your portfolio.

Spread The Word
MiningStore Recent Articles