0

Iowa Bitcoin Mining Hosting Facility 5

Iowa Facility 5 – Large-Scale Bitcoin Mining Hosting

Meeting Institutional Demand with Scale

MiningStore’s fifth Iowa facility was developed as a high-capacity expansion to serve the rising demand for institutional-grade Bitcoin mining. With 8 MW of total capacity and more than 2,600 miner slots, Facility 5 stands as one of the largest in our Iowa portfolio, purpose-built to accommodate large allocations from family offices, private equity firms, and institutional investors.

Now fully allocated, it reflects both the strength of institutional appetite and MiningStore’s ability to deliver enterprise-scale infrastructure in the U.S.

MiningStore Bitcoin Mining Facility 5 - 1

Iowa Bitcoin Mining Hosting Facility 5

Facility Highlights

  • Capacity: 8 MW total
  • Miner Slots: 2,600+ ASIC-ready positions
  • Grid Power: Connected to the SPP market for competitive energy economics
  • Scale: Designed to support concentrated large deployments under one roof
  • Status: Fully deployed and allocated
MiningStore Bitcoin Mining Facility 5 - 5

Inside Facility 5

Facility 5 was designed to prioritize capacity, density, and operational resilience, making it an ideal solution for large-scale investors looking to consolidate operations.

  • High-density layouts engineered to host 2,600+ miners efficiently.
  • Air-cooled infrastructure optimized for performance in Iowa’s favorable climate.
  • Robust power management integrated with the SPP market to capture cost advantages.
  • Institutional oversight by MiningStore’s operations team, ensuring maximum uptime and secure hosting.
  • Streamlined scalability for clients deploying at multi-megawatt levels.
MiningStore Bitcoin Mining - Facility 5

Why Facility 5 Matters

Enterprise-Level Capacity

At 8 MW and 2,600+ slots, Facility 5 provides the scale necessary to support institutional allocations in a single facility. This reduces operational fragmentation and simplifies portfolio oversight for investors.

Strengthened SPP Market Footprint

By expanding within the SPP grid, Facility 5 builds on MiningStore’s expertise in leveraging renewable-heavy energy markets with dynamic pricing windows, passing cost benefits directly to clients.

Validation of Market Demand

The rapid allocation of all slots at Facility 5 demonstrates the continued institutional appetite for U.S.-based Bitcoin mining infrastructure and MiningStore’s reputation as a trusted operator.

MiningStore Bitcoin Mining Facility 5 - 2

Looking Ahead

While Facility 5 is fully allocated, its success illustrates the accelerating demand for large-scale hosting capacity. MiningStore continues to expand with new builds designed to match institutional requirements for capacity, transparency, and ESG alignment.

MiningStore Bitcoin Mining Facility 5 - 4

Conclusion: Scale That Meets Institutional Expectations

MiningStore’s Iowa Facility 5 showcases what institutional Bitcoin mining looks like at scale. With 8 MW of capacity, 2,600+ miner slots, and full integration with the SPP power market, it represents the strength of MiningStore’s operational capabilities and the trust placed in us by institutional clients.

Although Facility 5 is fully allocated, new capacity is in development.

Schedule a consultancy call with our advisors to explore availability at other MiningStore sites and secure your allocation before the next facility fills.

Spread The Word
MiningStore Recent Articles