0

Iowa Bitcoin Mining Hosting Facility 7

Iowa Facility 7 – Mining at Scale with Expansion Capacity

A Dual-Phase Facility for Institutional Investors

MiningStore’s Iowa Facility 7 is a 10 MW hosting site designed to provide both immediate access to proven infrastructure and future expansion capacity. With 3,500+ miner slots and direct integration into the MISO power market, it represents one of the largest and most strategic additions to our portfolio.

Today, 5 MW is already operational, delivering stable performance for existing clients. The remaining 5 MW is scheduled to open in October 2025, giving new investors a rare opportunity to secure hosting space ahead of demand.

MiningStore Bitcoin Mining - Facility 7

Iowa Bitcoin Mining Hosting Facility 7

Facility Highlights

  • Capacity: 10 MW total (5 MW running, 5 MW opening Oct 2025)
  • Miner Slots: 3,500+ ASIC-ready positions
  • Grid Power: MISO market, renewable-driven and cost-competitive
  • Scale: MiningStore’s largest Iowa facility to date
  • Status: Partially operational with additional capacity coming online soon
MiningStore Bitcoin Mining Facility 7 - 4

Inside Facility 7

Facility 7 was engineered as a scalable platform for large institutional investors.

  • High-capacity infrastructure designed to host more than 3,500 miners under one roof.
  • Phased operations: 5 MW running today with another 5 MW committed for late 2025, ensuring continuity for new investors.
  • Air-cooled infrastructure optimized for density, uptime, and hardware longevity.
  • Professional oversight with technicians and monitoring systems safeguarding consistent uptime.
  • MISO grid access, creating energy cost advantages by leveraging Iowa’s renewable-rich supply.
MiningStore Bitcoin Mining Facility 7 - 3

Why Facility 7 Matters

Scale and Density

At 10 MW, Facility 7 provides one of the most enterprise-ready footprints in our Iowa portfolio. For investors, this means the ability to deploy large allocations without splitting across multiple sites.

Immediate Returns + Future Access

With 5 MW live now and another 5 MW opening in October 2025, Facility 7 combines current operational proof with the chance to reserve future capacity in a competitive market.

Institutional Fit

Designed for private equity, family offices, and high-net-worth investors, Facility 7 aligns with institutional needs: scale, transparency, renewable integration, and long-term reliability.

MiningStore Bitcoin Mining Facility 7 - 5

Looking Ahead

Facility 7 illustrates the next stage of MiningStore’s growth: larger capacity, phased expansions, and deeper integration with renewable-driven grids. As the Bitcoin mining landscape matures, sites like Facility 7 show how institutional investors can secure infrastructure that balances today’s yield with tomorrow’s scalability.

MiningStore Bitcoin Mining Facility 7 - 1

Conclusion: Flexible and Hybrid Infrastructure

MiningStore’s Iowa Facility 7 reflects how far institutional Bitcoin mining has come. With 10 MW of total capacity, 3,500+ slots, and phased deployment, it is built to provide both immediate performance and future growth opportunities.

Investors who secure positions now can benefit from operational hosting today while locking in capacity for October 2025, a competitive advantage in a tightening market.

Schedule a consultancy call with our advisors to reserve capacity at Facility 7 or explore availability across our Iowa portfolio.

Spread The Word
MiningStore Recent Articles