Hydro Site Implementation Checklist
The go-to guide every technician in hydro-cooled bitcoin mining needs
For Technicians Planning and Operating Hydro-Cooled Bitcoin Mining Facilities
This step-by-step checklist is designed to guide you through the process of planning, deploying, and optimizing a hydro-cooled mining site, with a focus on uptime, safety, and long-term profitability.
Phase 1: Feasibility and Site Assessment
- Confirm high-flow, stable water source (river, reservoir, treated wastewater)
- Assess seasonal variability and drought risk
- Identify available power capacity and connection timeline
- Check power pricing
- Review ambient climate (prefer <20°C average)
- Research local zoning laws and noise regulations
- Investigate water discharge permitting and environmental compliance
- Evaluate internet access and latency to mining pools


Phase 2: Infrastructure and Facility Preparation
- Secure property with appropriate zoning
- Level ground for AntSpace HK3 or other container footprint
- Install electrical infrastructure (transformers, switchgear, PDUs)
- Set up network infrastructure (fiber line, routers, firewall)
- Connect closed-loop cooling tower and prep water lines
- Source coolant with antifreeze and corrosion inhibitors
- Install security systems: cameras, access control, signage
- Ensure UL/CUL-certified components are used throughout
Phase 3: Container Setup and Equipment Deployment
- Position and secure AntSpace HK3 V2 container on leveled pad
- Connect container to power supply and cooling tower
- Prime system and fill coolant (target flow: 85 m3/h)
- Pressure test entire cooling system and monitor flow balance
- Install 210 Antminer S21 XP Hydro units
- Configure dashboard access (Braiins OS+, Foreman, etc.)
- Test for optimal water inlet/outlet temperatures (35°C/45°C)
- Run diagnostics on all ASICs before going live


Phase 4: Maintenance Schedule Setup
- Schedule monthly filter cleanings
- Set reminder for coolant pH test every 6 months (target 7-9)
- Create quarterly inspection checklist (cooling tower, flow meters, sensors)
- Monitor system performance with IoT alerts
- Track miner-level J/TH efficiency + uptime weekly
- Establish replacement inventory: spare pumps, filters, fans, and sensors
Phase 5: Operational Optimization
- Analyze real-time temperature, pressure, and flow data weekly
- Calibrate coolant usage vs. cooling tower output
- Adjust hashrate/power ratio as temperature rises seasonally
- Log historical performance for forecasting + warranty claims
- Evaluate grid incentives and flexible load contracts with utility
- Review ROI assumptions quarterly (BTC price, efficiency, energy cost)

Final Pre-Launch Audit
- Cooling system passes leak test and pressure regulation
- Water quality confirmed: filtered, treated, pH balanced
- AntSpace and ASICs fully powered, cooled, and online
- Staff trained on emergency procedures + safety shutdowns
- Dashboard and alerting system active and monitored
Looking to keep this checklist handy for your site planning or internal reviews?
Download the complete Hydro Site Implementation Checklist as a PDF for easy access, sharing, and offline reference.
For additional guidance or a turnkey deployment service, contact the MiningStore team sales@miningstore.com
We have deployed hydro-cooled facilities across the U.S. and offer full lifecycle support for sourcing, installation, and uptime.